|
Mar 10, 2025
|
|
|
|
LNWK 2322 - Distribution Line Construction Prerequisites / Corequisite Prerequisite: LNWK 1301 - minimum grade of C
Study of electric distribution line construction. Includes reading staking sheets and framing specifications, tailboard discussions, pole framing and setting, installing conductors, transformers and other line equipment, and OSHA and NESC regulations.
Hours (3 sem hrs; 2 lec, 2 lab)
Add to Portfolio (opens a new window)
|
|